What the report is - and isn't
Your report sets out any defects found in the building. It's not a specification for works. That's a separate stage, once we understand what projects you want to take forward.
The report is the starting point, not the finish line. The next step is turning it into a project: deciding what needs doing, in what order, and for what budget. That's something we can lead for you.
How churches usually take it forward
Every church is different, but the process usually starts with turning the report into a working brief: what's realistic, what matters most to your church's mission, and what the building can support.
From there, we'd typically look at:
Addressing anything urgent first, as its own smaller project if it exists, before moving on to a larger scheme.
Grouping the findings into a shape you can plan around. A minimum scheme keeps the building safe, a medium option covers the main issues, and a fuller scheme does more while any scaffolding or access is already in place.
The permissions involved. Faculty, and planning or consent where relevant, plus any other reports needed along the way (bat surveys, tree surveys, and similar, depending on the site).
A long-term strategy, not just a single project. Most churches are better served by a phased plan than a one-off scheme, particularly where sustainability or Net Zero Carbon ambitions are part of the picture. Small steps count; it doesn't need to be all-or-nothing.
Sometimes there's already a clear brief instead: a leak that needs resolving, or a change you already know you want, such as better access or reordering the space. These tend to move faster, since the starting point is already defined.
We begin with a feasibility stage to clarify the possibilities and constraints. We offer clear, early advice on what can be achieved for your budget, and we test options that balance design vision with practical need. For retrofits and heritage homes, we consider the building fabric from the outset – helping you make the right environmental decisions without compromising its character.
Beyond the survey
Chapter's ecclesiastical work goes beyond the survey itself. We take on repair and conservation projects, extensions, and new-build work, shaped by what the QI has identified and what your church wants to achieve.
Whoever carried out your survey already has a working knowledge of the building: previous repairs, known issues, and how it was constructed. Where the same architect takes on the project stage, that knowledge carries over rather than needing to be rebuilt.
We're also happy to continue as your inspecting architect on an ongoing basis, whether or not a project follows. Some churches simply want us as the person to call for ad-hoc guidance between inspections.
TITLE
St James, Hampton Hill
A quinquennial inspection here led to a full reordering project, alongside urgent brick repairs found along the way (around £6k of repointing). A drone survey of the tower followed, informing further roof repairs and a new heating scheme. [Read the full case study →]
St James, Hampton Hill
A quinquennial inspection here led to a full reordering project, alongside urgent brick repairs found along the way (around £6k of repointing). A drone survey of the tower followed, informing further roof repairs and a new heating scheme. [Read the full case study →]
Next steps
Common questions
QI’s are often written in very technical language making them pretty confusing for anyone without a background in buildings. These documents are really important so it is worth taking time to understand yours. We can talk you through your QI whether it was done by us or someone else so you can fully get to know your building.
A leaking roof, a long list of repairs, a fire risk assessment flagging the building as dangerous it's not always obvious what comes first. We can help you prioritise against your budget and what matters most to your church.
This happens, particularly where there's been a change in who's leading things at your end, such as a new vicar or a change of PCC. Before picking back up, it's worth checking the original aims still hold. Continuing with an old brief without revisiting it can mean the finished project no longer matches what you actually need.
It depends on a few things: whether permission is needed, whether the work was flagged in your QI, and who's advising you. Even something as simple as repointing can cause more harm than good if done the wrong way. Worth being cautious of any company that both recommends a piece of work and carries it out themselves. Independent advice first is usually the safer route. Feel free to run a quote past us, or ask before any works go ahead, we're happy to take a quick look.